# Some Completed Streets Not Included in Nodevember

**URL:** https://community.citystrides.com/t/some-completed-streets-not-included-in-nodevember/28385
**Category:** Support
**Created:** [November 7, 2024, 12:32am UTC](https://community.citystrides.com/t/some-completed-streets-not-included-in-nodevember/28385 "2024-11-07T00:32:09Z")
**Posts on this page:** 5
**Page:** 1

<div class="post-metadata">

### Author: ![cathy\_mullanix](https://community.citystrides.com/letter_avatar_proxy/v4/letter/c/3d9bf3/32.png) [@cathy\_mullanix](https://community.citystrides.com/u/cathy_mullanix)
#### Post date: [November 7, 2024, 12:32am UTC](https://community.citystrides.com/t/some-completed-streets-not-included-in-nodevember/28385/1 "2024-11-07T00:32:09Z")

</div>

🔗 My profile link : [Cathy Mullanix - CityStrides](https://citystrides.com/users/38334)

From Nov 1 to Nov 6 I have completed 128 streets by adding the completed streets from the Nov 1 to Nov 6 (inclusive) days on my Home page.

The Nodevember challenge shows 123 streets completed.

Four of the completed streets not included in the Nodevember total occurred on Nov 1 and are the following: 7th Street, Carpinteria; Cedar Place, Carpinteria; Fifth Street, Carpinteria; Juniper Place, Carpinteria

One of the completed streets not included in the Nodevember total occurred on Nov 6 and is Canon Street, Santa Barbara

These are the links of the streets

> **[7th Street - CityStrides](https://citystrides.com/streets/1100242)**
>
> The best tool to help you Run Every Street

> **[Cedar Place - CityStrides](https://citystrides.com/streets/1100172)**
>
> The best tool to help you Run Every Street

> **[Fifth Street - CityStrides](https://citystrides.com/streets/21440070)**
>
> The best tool to help you Run Every Street

> **[Juniper Place - CityStrides](https://citystrides.com/streets/1100275)**
>
> The best tool to help you Run Every Street

> **[Canon Drive - CityStrides](https://citystrides.com/streets/368855)**
>
> The best tool to help you Run Every Street

---

<div class="post-metadata">

### Author: ![JamesChevalier](https://community.citystrides.com/user_avatar/community.citystrides.com/jameschevalier/32/2_2.png) [@JamesChevalier](https://community.citystrides.com/u/JamesChevalier)
#### Post date: [November 7, 2024, 6:00pm UTC](https://community.citystrides.com/t/some-completed-streets-not-included-in-nodevember/28385/2 "2024-11-07T18:00:25Z")

</div>

Challenges include a start and optional end date, and only activities within that time frame are eligible.

Is it possible that you progressed a part of these streets sometime before November 1st? If so, that effort would not count towards the Challenge.

In the example of 7th Street, [Cathy Mullanix's activity on October 31, 2024 - CityStrides](https://citystrides.com/activities/67255234) progressed it and [Cathy Mullanix's activity on November 1, 2024 - CityStrides](https://citystrides.com/activities/67297594) completed it.  
So for Nodevember, which only looks to activities from November 1-30, none of that October 31 progress would count & that would leave the street as unfinished for the Challenge.

---

<div class="post-metadata">

### Author: ![cathy\_mullanix](https://community.citystrides.com/letter_avatar_proxy/v4/letter/c/3d9bf3/32.png) [@cathy\_mullanix](https://community.citystrides.com/u/cathy_mullanix)
#### Post date: [November 7, 2024, 7:45pm UTC](https://community.citystrides.com/t/some-completed-streets-not-included-in-nodevember/28385/3 "2024-11-07T19:45:34Z")

</div>

Got it! Thanks for the explanation. Makes sense

---

<div class="post-metadata">

### Author: ![hcethatsme](https://community.citystrides.com/user_avatar/community.citystrides.com/hcethatsme/32/780_2.png) [@hcethatsme](https://community.citystrides.com/u/hcethatsme)
#### Post date: [November 25, 2024, 8:51pm UTC](https://community.citystrides.com/t/some-completed-streets-not-included-in-nodevember/28385/4 "2024-11-25T20:51:49Z")

</div>

Hmm, I was just noticing a similar issue but on streets I ran completely yesterday - is it possible the Nodevember processing is stuck? here’s my activity [Hilary Caws-Elwitt's activity on November 24, 2024 - CityStrides](https://citystrides.com/activities/68551419) but my Nodevember stats haven’t updated since last week. I know you may be super-busy with the Strava mess and it’s not a big deal…

---

<div class="post-metadata">

### Author: ![JamesChevalier](https://community.citystrides.com/user_avatar/community.citystrides.com/jameschevalier/32/2_2.png) [@JamesChevalier](https://community.citystrides.com/u/JamesChevalier)
#### Post date: [November 30, 2024, 6:12pm UTC](https://community.citystrides.com/t/some-completed-streets-not-included-in-nodevember/28385/5 "2024-11-30T18:12:26Z")

</div>

There’s definitely something weird going on with Challenge processing. I changed some infrastructure stuff that looked odd, and I just sent in the month’s activities for reprocessing … Let’s see if - well, let’s see if that can finish today 😅 and if it cleans up the data.
